This project was carried out after a natural disaster caused by exceptional rainfall. We designed a liftable bridge to allow the waters of the Chioma stream to flow freely in situations of emergency.
In collaboration with an engineering firm, we supplied, manufactured and installed a hydraulic system, complete with a control panel for lifting the bridge 4,5 meters above the water level.