In the urban setting of Place Rogier in Brussels, a central hub for the city's metro network, we supplied and manufactured all secondary steel structures required for the installation and tensioning of the architectural membranes covering the station. The project demanded seamless integration with existing elements and a refined balance between architectural design and advanced steel technology.