We supplied the main steel structure for the new Odense Velodrome, manufacturing eight arched trusses up to 80 meters long. Each component was fully prefabricated and pre-assembled in our production facility, then divided into transportable modules to streamline logistics and ensure fast on-site assembly. Our supply also included tension rods and auxiliary steel components for the architectural fabric system.
The installation of the entire steel structure was completed in just six weeks, using custom-designed temporary support towers and one-off assembly structures developed specifically for this project.